2FeaturesOption to change order of the window buttons (#4915) Feature Open: Under consideration accessibility desktop theming ui6h agoby Maple Current problemI like the close button on the left, maximize toggle on the right, and minimize hidden.Proposed changeLet me rearrange them in any order I like.PlatformmacOS, Windows, Linux pasted-image-1.png797×76 | 8 kB Link to pasted-image-1.pngComments Sign in with Fluxer to comment and vote.No comments yet.
Comments
No comments yet.